Tight Deadlines, Low Orders, and Designer Shortages Hurt Truss Makers

Written by TrussWise Owl | Jun 9, 2025 9:46:18 PM
The truss manufacturing industry in 2025 is navigating a tough landscape. Tight deadlines, shrinking order files, and a critical shortage of designer resources are creating significant challenges for mid-sized manufacturers. These pressures often lead to lost opportunities—missed bids or delayed projects—and widespread burnout among teams already stretched thin. This issue is compounded by inefficiencies in quoting processes, as highlighted in our post on why your quoting process slows you down (/blog/why-your-truss-quoting-process-is-slowing-you-down), and the misallocation of designer talent, as discussed in why designers shouldn’t handle estimating (/blog/why-truss-designers-shouldnt-handle-estimating-a-guide-to-better-efficiency). This blog dives into these pain points, exploring their impact on your business and offering practical strategies to build resilience, so you can keep your operations running smoothly despite industry headwinds.
 
The Pressure of Tight Deadlines
Tight deadlines have become a defining challenge in truss manufacturing, driven by client demands and supply chain disruptions. Projects often require quotes and designs within days, yet delays in materials—like roofing insulation or steel—can stretch lead times, forcing rushed production. This leaves little margin for error, with teams working overtime to meet schedules. A common scenario is a last-minute spec change requiring a complete redesign, putting designers and estimators under intense pressure. The result? Missed details in quotes or designs, delayed deliveries, and strained client relationships, all of which erode profitability and competitive edge.
 
The Challenge of Dwindling Order Files
Economic uncertainty has led to a noticeable decline in order volumes, with some manufacturers reporting pipelines 30% thinner than in 2024. This downturn forces companies to bid on more projects to maintain revenue, increasing the workload on already limited teams. The shift from selective, high-value bids to a higher volume of opportunities can overwhelm estimating processes, leading to errors or delays that cost potential wins. This paradox—fewer orders demanding more effort—stretches resources thin, exacerbating burnout and reducing the ability to capitalize on available opportunities.
 
The Scarcity of Designer Resources
The industry faces a significant shortage of designer resources, fueled by an aging workforce and a lack of new talent. Recent data indicates a 15% reduction in staff at mid-sized firms since January 2025, with many losing experienced designers to retirement or other sectors. This leaves fewer hands to handle complex design tasks, often pushing remaining designers into estimating or quoting roles that don’t match their skill set. The consequence is lost opportunities, as projects stall due to design bottlenecks, and burnout, as designers juggle multiple responsibilities under tight deadlines, further straining your team’s capacity.
 
The Ripple Effect: Lost Opportunities and Burnout
The combination of tight deadlines, dwindling orders, and designer shortages creates a ripple effect that impacts your bottom line. Lost opportunities occur when rushed quotes miss bid deadlines or delayed designs fail to meet client expectations, potentially costing a $50,000 contract. Burnout sets in as designers and estimators work longer hours to compensate, leading to mistakes, reduced morale, and higher turnover. This cycle not only affects current projects but also threatens long-term growth, as retaining talent becomes increasingly difficult amidst these pressures.
 
Practical Strategies to Address These Pain Points
Navigating these challenges requires a proactive approach to protect your team and maintain efficiency. Here are four strategies to consider:
  1. Prioritize Task Allocation: Assign estimating and quoting to a dedicated team (e.g., sales or administrative staff) with clear checklists (e.g., job tag, spans, loads). This frees designers for high-value design work, reducing pressure on tight deadlines. For more on this, see our post on why designers shouldn’t handle estimating (/blog/why-truss-designers-shouldnt-handle-estimating-a-guide-to-better-efficiency).
  2. Streamline Quoting Processes: Use templates for common truss designs (e.g., 30ft span, 4/12 slope) to speed up quote generation, helping manage increased bid volumes from dwindling orders.
  3. Leverage Technology: Adopt tools that automate calculations and centralize data, allowing a small team to handle higher quoting demands without overloading designers. For detailed steps, check out our blog on 5 Best Practices to Quote Trusses Faster and Win More Jobs (/blog/5-best-practices-to-quote-trusses-faster-and-win-more-jobs).
  4. Support Your Team: Implement flexible schedules or cross-training to alleviate burnout, ensuring designers have time to recharge while estimators can step in during peak periods.
These steps can help you maintain quality and efficiency, even as external pressures mount.
 
Moving Forward with Resilience
Tight deadlines, dwindling orders, and designer shortages are tough realities, but they don’t have to define your success. By reallocating tasks, streamlining processes, and supporting your team, you can turn these pain points into opportunities for growth. Want to dive deeper into optimizing your quoting process? Check out our blog on 5 Best Practices to Quote Trusses Faster and Win More Jobs (/blog/5-best-practices-to-quote-trusses-faster-and-win-more-jobs) for actionable tips to keep your pipeline flowing. For insights on manual quoting inefficiencies.